Supplement to the table (b): Wage equipment and services

​​Services of Saudi Ports 13/9 / 1419H - 31/12/1998 Supplement to Schedule (B) Fees for Additional Services​


First: The wages of the sea​​


1. Floating crane wages:​


​​​Item No
​​Description
​​Amount ​i​n Rials
Unit​
​1.1
For a unit weighing up to 60 tons:
  • Using a 200 ton crane and more.
  • Using a crane load less than 200 tons.​

50
30
​For each lifting process for a ton or part thereof
​1.2
​For a unit weighing more than 60 tons:
  • Using a 200 ton crane and more.
  • Using a crane load less than 200 tons.

100
80
​For each lifting process for a ton or part thereof
​1.3
​In addition to the above wages, the period from the time of leaving the crane to its place and return to it shall be:
  • Crane load 200 tons and more.
  • Crane load less than 200 tons.


500
300
​Per a hour or part thereof

Note :

Minimum Leverage:
  • Crane load 200 tons and more: (1000) SR for each business trip.
  • Crane load less than 200 tons: (750) SR for each business trip.​
​​​Item No
Description
Amount ​i​n Rials
Unit​
​1.4
​The floating crane will be rented on an hourly basis from the time it leaves until it returns to it:
  • Crane load 200 tons and more.
  • Crane load less than 200 tons.​



5000
3000
​For the hour or part thereof
​1.5
​Wait time for lift:
  • Crane load 200 tons and more.
  • Crane load less than 200 tons.​

1000
750
​For the hour or part thereof


2. Wages of locomotives:​

​​​Item No
Description
Amount ​i​n Rials
Unit​
​2.1
​Up to 1200 HP
​600
​2.2
​More than 1,200 HP to less than 2,000 HP
​1500
​2.3
​From 2,000 horsepower to less than 4,000 horsepower
​2000
​2.4
​4000 hp and more
​3000

Note :

The above fees are obtained in normal use cases, and in emergency situations such as rescue, fire extinguishing, etc., these wages are three times higher.​




3. Extension Boat Fees:​

Item No
Description
Amount ​i​n Rials
Unit​
​3.1
​Up to 500 HP
​200
For every hour or part of it from the departure of the boat to the marina until his return​​​
​ ​
​3.2
​More than 500 horsepower to less than 1,000 horsepower
​500
​3.3
​1000 horsepower and more
​800





4. Fire fighting vessels' wages:​

Item No
Description
Amount ​i​n Rials
Unit​​​
​4.1
​Up to 1,000 HP
​2500
​​For every hour or part of it from the departure of the boat to the marina until his return​​​
​ ​
​4.2
​More than 1,000 horsepower to less than 2,000 horsepower
​3500
​4.3
​More than 2,000 horsepower to less than 4,000 horsepower
​5000
​4.4
​4000 hp and more
​10000





5. Fees of pollution control ships:​

​​Item No​
Description
Amount ​i​n Rials
Unit​​​
​5.1
​Up to 500 HP
​3500
​​​​For every hour or part of it from the departure of the boat to the marina until his return​​​
​5.2
​More 500 HP
​5000




6. Fees of marine survey boats:​

Item No
Description
Amount ​i​n Rials
Unit​​​
​6.1
​Up to 1500 hp
​3000
​​For every hour or part of it from the departure of the boat to the marina until his return​​​
​6.2
​More 1500 hp
​5000





7. Sanders' wages help with pollution control:​

Item No
Description
Amount ​i​n Rials
Unit
​7.1
​Up to 200 tons (GRT)
​2000
​For every hour or part of it from the departure of the boat to the marina until his return​​​
​7.2
​More than 200 tons (GRT)
​3500





8. Fees of other marine parts:​

Item No
Description
Amount ​i​n Rials
Unit
​8.1
Ties Boat 
​100
​​​​​
​ ​ ​ ​For every hour or part of it from the departure of the piece until it returns to Marsa
​8.2
General service boat
​100
​8.3
 Pull​  Boat 
​100
​8.4
Help ship divers
​800
​8.5
Fuel supply vessel
​500
​8.6
Sandals Goods handling
​2
For each ton of load capacity of the sandal for one day or part thereof




Second: Wages of goods handling equipment (wages based on the capacity of the equipment)​

1. Electric platform cranes and mobile cranes:

Item No
Description
Amount ​i​n Rials
Unit
​1.1
Less than 20 tons
​250
For each hour or part thereof
​1.2
From 20 tons to less than 30 tons
​350
For each hour or part thereof
​1.3
From 30 tons to less than 90 tons
​450
For each hour or part thereof
​1.4
From 90 tons to less than 200 tons
​800
For each hour or part thereof
​1.5
More than 200 tons
​1000
For each hour or part thereof


Item No
Description
Amount ​i​n Rials
Unit
​2.1
Less than 6 tons
​100
​For each hour or part thereof
​2.2
From 6 tons to less than 10 tons
​200
​For each hour or part thereof
​2.3
From 10 tons to less than 20 tons
​300
​For each hour or part thereof
​2.4
20 tons and more
​400
​For each hour or part thereof


Item No
Description
Amount ​i​n Rials
Unit
​3
Trailers
​50
​​For each hour or part thereof
​4
Headers (with driver)
​100
​​For each hour or part thereof




Third: The remuneration of public services​:



1. The cost of the sea crossing:​

Item No
Description
Amount ​i​n Rials
Unit
​1.1
For ships up to 36 meters in length

2000



600

​For the first day or part thereof, including the work of processing and lifting

For each of the following days or part thereof
​1.2
For ships over 36 meters in length
​                        3000
                     


                         1000
​For the first day or part thereof, including the work of processing and lifting

For each of the following days or part thereof​




2. Non-commercial berth:​

​​Item No
Description
Amount ​i​n Rials
Unit
​2.1
Any piece of sea up to 20 meters in length
​50
For one day or part thereof
​2.2
More than 20 meters up to 40 meters
​100
For one day or part thereof
​2.3
For vessels over 40 meters in length
​150
For one day or part thereof




3. Wages of car weight on the scales of the port:​

Item No
Description
Amount ​i​n Rials
Unit
​3.1
Less than 10 tons
​10
​Per Unit
​3.2
More than 10 tons up to 50 tons
​20
​Per Unit
​3.3
More than 50 tons
​50
​Per Unit

Note:

  • The weight of the vehicle includes empty with the loaded goods.
  • This fee shall be paid if the weight of the vehicle is at the request of the owner of the goods, and does not occur in cases where the weight is taken at the request of the port administration.​



4. Ship supply with water:​

Item No
Description
Amount ​i​n Rials
Unit
​4.1
On the sidewalk
​20
Per ton or part thereof
​4.2
By sandals
​25
Per ton or part thereof




5. Guidance:​

Extension fees according to vessel capacity are calculated in gross tonnage as follows:​

Item No
Description
Amount ​i​n Rials
Unit
​5.1
500 tons or less
​200
For each movement
​5.2
More than 500 tons and up to 3000 tons
​500
For each movement
​5.3
More than 3000 tons and up to 15,000 tons
​1000
For each movement
​5.4
More than 15,000 tons and up to 50,000 tons
​1500
For each movement
​5.5
More than 50,000 tons
​2000
For each movement
​5.6
Gore Extension Services
​400
​Per hour or part thereof

Note:

This remuneration shall also apply in the case of the presence of the guide to the ship and the non-need for his services for reasons beyond his control​




6. Oil Barrier Fees:​

Item No
Description
Amount ​i​n Rials
Unit
​6.1
Light or medium barriers
​100
For every ten meters or part thereof in a day or part thereof
​6.2
Deep water barriers
​200
For every ten meters or part thereof in a day or part thereof




7. Fees for providing services to ships in Al-Muttaq area using public service boats:​

Item No
Description
Amount ​i​n Rials
Unit
​7.1
Conveying drums
​30
Per barrel
​7.2
Transportation of catering materials and others
​250
For every hour or part of it starting from leaving the boat until his return to the marches
​7.3
Transfer of personnel
​100
For every hour or part of it starting from leaving the boat until his return to the marches



8. Electricity:​ According to the prices of the official bodies plus 20%.​